The system modelled in this example is a simple SCR hanging from an installation vessel in 1500m of water. The SCR has been fully paid out by the installation vessel and is being transferred to a floating production unit (FPU). The installation vessel is oriented beam-on to the semi-submersible in preparation for transfer. The SCR is then first paid out to the transfer depth by a winch on board the installation vessel. It is then transferred to the host platform (FPU) winch and pulled in to its hang-off elbow on the host platform.